Surveying the transport route of wind power equipment Dak Song – Dak Nong was deployed by Hop Nhat Bach Viet Company in January 2021.

What is the purpose of surveying the transport route of wind power equipment in Dak Song?

Wind power projects, equipment such as propellers, motors…have a very large length. Specifically, the propeller is up to 76m long and must be transported by super-long and super-weight vehicles.

Khảo sát tuyến vận chuyển thiết bị điện gió Đắc Sông - Đắc Nông
Surveying the transport route of wind power equipment Dak Song – Dak Nong

Then, at the bends, it is necessary to survey and measure to calculate road widening, clear hard objects on the road when necessary such as power poles, houses, trees….

Survey location: at Thuan Hanh commune, Dak Song district, Dak Nong province.

Khảo sát tuyến vận chuyển thiết bị điện gió Đắc Sông - Đắc Nông
Surveying the transport route of wind power equipment Dak Song – Dak Nong

Equipment used for surveying the transportation route of wind power equipment:

  1. Phantom 4″ Flycam
  2. RTK T300 . GNSS receiver
  3. Electronic total station
  4. Specialized 360 shooting equipment.

Some pictures of surveying the current status of the wind power equipment transportation route

Khảo sát tuyến vận chuyển thiết bị điện gió Đắc Sông - Đắc Nông
Surveying the transport route of wind power equipment Dak Song – Dak Nong
Khảo sát tuyến vận chuyển thiết bị điện gió Đắc Sông - Đắc Nông
Surveying the transport route of wind power equipment Dak Song – Dak Nong
Khảo sát tuyến vận chuyển thiết bị điện gió Đắc Sông - Đắc Nông
Surveying the transport route of wind power equipment Dak Song – Dak Nong
Khảo sát tuyến vận chuyển thiết bị điện gió Đắc Sông - Đắc Nông
Surveying the transport route of wind power equipment Dak Song – Dak Nong
Khảo sát tuyến vận chuyển thiết bị điện gió Đắc Sông - Đắc Nông
Surveying the transport route of wind power equipment Dak Song – Dak Nong