Topographic survey with scale 1/500 of De Nghia Farm project in Ca Dy Commune, Nam Giang District, Quang Nam Province. The terrain is rugged mountain, the project area is separated by a Dak Mil river. The purpose of the topographic survey in Nam Giang is to supplement the application for land use and design a goat farm for the De Nghia system in Da Nang.

CONTACT FOR QUOTATION OF TOPOGRAPHIC SURVEY IN QUANG NAM RPOVINCE 0903692185

Scope of topographic survey and used equipments

Topographic survey area is 30/100 Ha in Ca Dy area. The mountain is quite high. Therefore, Bach Viet used flycam: Phantom 4 RTK and Mavic 2 Pro.

Collect data including:

  1. Clip of the whole project
  2. Orthogonal image
  3. 3D model
  4. Topographic plan with scale 1/500, contour line 1m.
  5. 2 landmarks controlling the coordinates of traverse level 2.

The detailed measurement support devices include Hi target V30 and accessories.

The implementation staff includes 4 surveying and mapping engineers.

The implementation time is 10 working days: the field time is 3 days and the internal processing time is 7 days. Including the programming of the digital map website.

Some pictures of topographic survey in Quang Nam province

Ảnh trực giao dự án khảo sát địa hình Dê Nghĩa Farm Quảng Nam
Orthogonal image of the topographic survey project of De Nghia Farm in Quang Nam province
Bản đồ số dự án Dê Nghĩa Farm Quảng Nam
Digital map of De Nghia Farm in Quang Nam province
Bình đồ 1/500 dự án Dê Nghĩa Farm tại Quảng Nam
Topographic plan with scale 1/500 of De Nghia Farm in Quang Nam province

More: KHẢO SÁT ĐỊA HÌNH 1/500 ĐỨC TRỌNG LÂM ĐỒNG