Hop Nhat Bach Viet Co., Ltd performed geological survey drilling of project Cainiao Dong Nai Smart Logistics Park in Dong Nai Province. Geological survey for Cainiao warehouse design.

CONTACT FOR CONSTRUCTION SURVEY 0903692185

Content of geological survey

Geological survey for design workThe content of geological survey work includes:

  1. Drilling 16 holes on land, each hole is 20m long.
  2. SPT test
  3. Test of 9 criterias according to TCVN
  4. Consolidation compression test

Geological survey records

Geological survey records include:

  1. Construction diary
  2. Sampling records
  3. Testing results
  4. Geological section
  5. Geological survey report

Some pictures of geological survey

Định vị hố khoan

Locating boreholes

Công tác khoan địa chất
Geological drilling work
Mẫu đất
Land samples
Thí nghiệm trong phòng LAS
Experiment in the LAS room
Thí nghiệm trong phòng LAS
Experiment in the LAS room
Khoan khảo sát địa chất dự án Cainiao Dong Nai
Geological survey drilling of project Cainiao Dong Nai